We had the challenging, yet rewarding task of converting two classrooms that were not being used to there full potential.

  • From start to finish ACW Completed the following:
  • We firstly removed the large aluminum glass sliding doors with utmost care so they can be used elsewhere in a future project.
  • Removed a full height plasterboard partition wall.
  • Removed and relocated 820 wide door encased in a aluminum frame complete with a side window (new entrance).
  • Installed a new 10 meter long partition wall, lined with a soundchek plasterboard and insulated with a high graded acoustic insulation.
  • Installed 2 new walls / door frame/ door to create a storage room complete with shelving and rails for storage of props and costumes.
  • Installed new ”Art Track” hanging system.
  • Re en stated all existing skirting boards / Floor tiles.
  • Organised Full height glass mirrors to be installed to full length of 1 wall only.
  • Organised Emerald Electrics for the Disconnect and Reconnect of all electrical fittings.
  • All Walls / Ceiling tiles / ceiling grid system / Mechanical outlets / ceiling speakers were all painted in a solver brand night sky colour.

PROJECT DETAILS

Client: ST GEORGES ANGLICAN SCHOOL PERTH CBD
Location: PERTH CBD
Completed: FEBRUARY 2016
Category: COMMERCIAL PROJECTS / PARTITION WALLS / ROOM DIVIDERS